Halt with inner walls in rorbu

10th July (transfered from document)

Came to an halt with the inner walls at the upper floor in the rorbu after the inner walls for the toilet was also done.
Now we have to wait for the pipelayer’s drawings to know where the pipes should be and the electrician to know where the electricity should come from.

Time to work some on the outside of the rorbu.